Project Details
Kozeny-Wagner was the Design/Build Contractor for the replacement of the existing in-bound baggage system that includes six input belts located on the lower level, six claim devices on the baggage claim level, and two oversize belts. The work included the removal of the existing in-bound system in its entirety. Kozeny-Wagner’s scope also included modifications to the existing airport electrical system, removal of the existing dog houses above the current claim devices, and a traffic flow layout plan for the airplane tugs.